Metro Tunnel Project
Location: Melbourne, VIC Australia
Type of work:
- Tunnel Lining work undertaking high risk complex works and engaged for all inverts, ground and roof beams, column, side walls and crown arch pressure pours including temporary works design and installation. More than 48,000 cubic meters of architectural Concrete placement for both 300 meter trinocular underground stations beneath Swanston Street, and 180 arch pours in excess of 2km in distance.
- Capping beams, Shafts and associated Structures.